TIGER-1 Drill Ship Second Sea Trial Success
Time:2016-02-03Page View:8319
On 29th December, 2015, TIGER-1 drill ship successfully completed the 12-days second sea trial. The trial was focused at mooring system and drilling system integrated acceptance test. The drilling package designed and manufactured by Honghua Group (HH) successfully passed the test with a satisfactory result.TIGER-1 is the first intelligent drilling ship which has completely ind...
Read
|